Skip to content
Service Area

Where we build in the White Mountains

We're based in Taylor and build custom homes on our clients' land across the White Mountains of Navajo County, plus a few nearby communities in Apache County. Where your lot sits decides who issues the building permit and which design requirements apply. Here's a short guide by area.

By Area

Towns and areas we serve

Inside town or city limits, the town issues residential building permits. Outside them, permits come from the county: Navajo County for Linden, Heber-Overgaard, Clay Springs and Pinedale, and Apache County for Concho and Vernon.

Town of Snowflake · about 5,600 ft

Snowflake

Taylor's neighbor to the north. The town runs its own building safety department, and lots outside town limits go through Navajo County.

Building permits: Town of Snowflake Building Safety
Our work here: The Anson

City of Show Low · about 6,300 ft

Show Low

Higher up, in the ponderosa pines. The city publishes its own design criteria for builders, including roof snow loads. Show Low addresses outside city limits, such as Linden, are permitted by Navajo County.

Building permits: City of Show Low permits

Town of Pinetop-Lakeside · about 6,800 ft

Pinetop-Lakeside

Pinetop and Lakeside became one town in 1984. It's the highest of the towns we build in, and plans have to meet the code edition the town has adopted, which can differ from its neighbors'.

Building permits: Town of Pinetop-Lakeside Building & Safety

Unincorporated · Apache County · about 6,300–7,000 ft

Concho & Vernon

Just across the county line to the east, within a reasonable drive of Taylor. These communities are unincorporated, so building permits come from Apache County's Building Safety office in St. Johns. As with rural Navajo County lots, many need a septic permit and a well, and we look at both during a site evaluation.

Building permits: Apache County Building Safety

Building Up Here

What every White Mountains lot has in common

Snow loads vary by elevation

Design snow loads are set by each permitting jurisdiction and change with elevation and roof pitch. We design the structure to the requirement for your parcel.

Wildfire is part of the plan

Many lots here sit in the pines. We plan clearing, materials and access with wildfire in mind from the first site visit.

Water, power and septic come first

Whether your lot has a water provider, power at the line and soil that passes a perc test shapes the cost and timeline. Our free site evaluation covers all three.

Have land somewhere on this list?

We'll walk it with you and tell you what it takes to build there. The first visit is free.